Description
The Lenovo 7DD5A003WW RT3kVA 2U Rack or Tower UPS-G2 provides reliable power protection for high-availability server, storage, networking, and other IT environments. Its flexible 2U design supports either rack-mounted or tower deployment, making it suitable for data centers, offices, and distributed IT installations.
Delivering up to 3000 VA / 3000 W with efficiency of up to 98%, this line-interactive UPS helps protect connected equipment against power outages, voltage sags, surges, under-voltage, and over-voltage conditions. It also incorporates Advanced Battery Management technology, hot-swappable batteries, programmable load segments, and a graphical LCD for simplified monitoring and control.
The UPS supports USB and RS-232 communications and can be expanded with an optional Network Management Card for remote monitoring and management. Extended Battery Modules can also be added for longer runtime during prolonged outages.
Key Features
- 3000 VA / 3000 W power capacity
- Flexible 2U rack or tower installation
- Up to 98% efficiency
- Line-interactive sinewave output
- Advanced Battery Management technology
- Hot-swappable batteries
- Support for extended battery modules
- Programmable load segments
- Graphical LCD monitoring and configuration
- USB and RS-232 connectivity
- Optional remote network management
- Optional temperature and humidity monitoring
- Remote On/Off and Remote Power Off support
Technical Specifications
| Specification | Details |
|---|---|
| Brand | Lenovo |
| SKU / Part Number | 7DD5A003WW |
| Product Type | Uninterruptible Power Supply (UPS) |
| Model | RT3kVA 2U Rack or Tower UPS-G2 |
| Input Voltage | 100β125 V AC |
| Form Factor | 2U Rack or Tower |
| Topology | Line-interactive, high-frequency, sinewave output |
| Power Rating | 3000 VA / 3000 W |
| Efficiency | Up to 98% |
| Energy Star Compliant | Yes |
| Input Frequency | 50/60 Hz |
| Output Voltage Settings | 100 / 120 / 125 V AC |
| Output Frequency | 50/60 Hz |
| Output Connectors | 6 Γ NEMA 5-20R, 1 Γ NEMA L5-30R |
| Battery Type | Valve Regulated Lead Acid (VRLA), sealed and leak-proof |
| Battery Capacity | 9 Ah |
| Battery Management | Advanced Battery Management (ABM), automatic battery testing, deep-discharge protection |
| Battery Replacement | Hot-swappable |
| Extended Battery Support | Up to 4 Extended Battery Modules |
| USB Port | Yes, USB Type-B |
| Serial Port | RS-232 via RJ-45 |
| Network Management | Optional Network Management Card |
| Environmental Monitoring | Optional Environmental Monitoring Probe |
| Control Panel | Intelligent 5-button graphical LCD |
| LED Indicators | Power On, On Battery, Alarm |
| Remote Control | Remote On/Off and Remote Power Off |
| Approx. Dimensions (H Γ W Γ D) | 86 Γ 441 Γ 602 mm |
| Approx. Weight | 22.4 kg |
| Operating Temperature | 0β40Β°C |
| Relative Humidity | 0β90%, non-condensing |
| Maximum Operating Altitude | 3,000 m |
| Warranty | 3 years, 9Γ5 Next Business Day onsite hardware response |
Payment & Security
Your payment information is processed securely, and we do not store credit card details or access your credit card information.
Return Policy (Short Summary)
We offer a 30-day return window for most unopened, factory-sealed items.
Returns must be authorized before shipping back and must include all original packaging and accessories. Opened or used items are not returnable unless defective.
Some productsβsuch as custom orders, special-order items, audio gear, software, and LED video wallsβare non-returnable. Non-defective returns may be subject to a 20β30% restocking fee, and customers are responsible for return shipping costs.
For damaged or incorrect items, please contact us immediately.
From Scope to Sign-Off
A structured delivery process designed to reduce risk and keep projects moving.
Plan
Discovery, site review, requirements gathering, and project alignment. We define scope, constraints, and success criteria before any design work begins.
- Discovery calls & stakeholder interviews
- On-site survey & infrastructure review
- Requirements & use-case documentation
- Project scope, timeline & milestone alignment
Engineer
System design, schematics, signal flow, BOM development, and documentation. Every project leaves this phase with a complete engineering package.
- AV system design & signal flow diagrams
- Equipment selection & BOM development
- Rack layout & control system design
- As-built documentation package
Deploy
Procurement, logistics, installation, programming, commissioning, and training. We own the delivery from first shipment to final handoff.
- Authorized procurement & logistics coordination
- Physical installation & cable management
- Control system programming & configuration
- Commissioning, testing & end-user training
Support
Monitoring, maintenance, lifecycle planning, and long-term service agreements. We stay engaged long after project close.
- 24/7 remote system monitoring
- Preventive & reactive maintenance
- Technology lifecycle & refresh planning
- Long-term service level agreements
A decade of delivery β trusted by 275+ clients across industries
